Centrale Hydro-Québec - Tasiujaq

Category:
Civil Engineering
Status:
Completed
project value:
30 million
client name:
Hydro-Québec
client website link:
community:
Tasiujaq
date of completion:
December 1, 2024
technical challenges:
  • Management and coordination of multiple disciplines
  • Quality control of a multidisciplinary project
  • This type of project in the far north requires extensive logistics
  • project summary

    The project involves the design, construction, and commissioning of a new thermal power plant in Tasiujaq, located 2.9 km southwest of the village and 700 m from the airport. FCNQ is responsible for civil/earthworks, concrete and steel structures, architecture, and building systems (mechanical and electrical).This thermal power plant consists of 3 generator sets and includes the following major works: Maritime transport of equipment and materials required for the construction of the new power plant, engineering design, complete construction of the access road and excavation and backfilling of the plant's foundations with granular materials (MG-112 and MG-20), supply and installation of materials and various systems including equipment related to the construction of the new diesel power plant, handling and installation of equipment provided by Hydro-Québec, commissioning and startup of the different systems.

    See Similar Projects

    ADDRESS: 19400 Clark-Graham,Baie ​D'Urfé, Qc, H9X 3R8
    TEL: (514) 457-9375
    FAX: (514) 457-0641
    #RBQ: 8359-3426-01
    Follow Us
    EMAIL

    © FCNQ CONSTRUCTION INC 2023.
    Powered by Boris & Associates Inc.