The successful production of 12,000 m3 of compliant granular material was executed in accordance with the specified requirements within a short timeframe. Work on the runway was exclusively scheduled for nighttime to minimize disruption to flying operations. Occasionally, operations had to be temporarily interrupted to accommodate the arrival of a medical plane, prioritizing critical emergency situations.
Emergency contract for the production and placement of 12000 m3 of granular materials on the runway at Puvirnituq Airport